Superlit Pipe Industries
  • Home
  • Corporate
      • About us
      • Timeline
      • Management
      • Quality Policy
    • Human Resources
      • HR Policy
      • Vacancies
      • Job Application Form
  • Products and Services
      • GRP Pipe
        • Fields of Use and Benefits
        • GRP Pipe Diameters and Technical Properties

      • GRP Fittings
        • Tee Pieces
        • Elbows
        • Flanges
        • Reducers
      • GRP Couplings
        • GRP Full-Face® Coupling
        • GRP Slip on Coupling
        • GRP Jacking Coupling

      • GRP Manholes

      • Tanks and Water Retention Systems

      • Special Applications
        • Jacking Pipes
        • Relining Pipes
        • Marine Lug®
        • Dark Liner GRP Pipe

      • Supervision Service
  • Technology and Quality
      • Continuous Filament Winding (CFW)

      • Centrifugal Casting (CC)

      • Helical Filament Winding (HFW)
      • Standarts & Tests
        • Classification Of Products
        • Performance Standarts & Accreditations
        • Quality Control & Performance Tests
  • Applications
    • Applications
      • Potable Water and Clean Water
      • Irrigation
      • Hydroelectric Power Plants
      • Waste Water and Drainage
      • Sea Water Intake and Discharge
      • Trenchless Technologies
    • Other Applications
      • Water Storage Systems
      • Industrial Applications
      • Gallery Systems
  • SUPERLIT in the World
      • References
      • Our Business Partners
  • Media
      • E-Bulletin
      • Videos
      • News
      • Corporate Logos
  • Contact
    • Offices
      • İstanbul Headquarter
      • Romania Headquarter
    • Factories
      • Düzce Factory
      • Malatya Factory
      • Romania Factory
  • Search
  • Türkçe
  • Română
  • Français
  • Español

Shipments of GRP Pipes and Fittings to Konya Plain 1-2-3 Irrigation Completed.

News / 5 September 2022
konya

The production and shipment of a total of 6800 meters of pipes and fittings with diameters ranging from DN600 to DN1800 have been completed in the first section of “Konya Plain 1-2-3 Irrigation Project” carried out by the Housing Development Administration (TOKİ) and contracted by Everest Mining.


  • CORPORATE

  • About Us

  • Timeline

  • Management

  • Human Resources

  • MEDIA

  • e-Bulletin

  • Videos

  • News

  • Corporate Images

  • PRODUCTS & SERVICES

  • GRP Pipe

  • GRP Fittings

  • GRP Full-Face® Coupling

  • GRP Menholes

  • Tanks and Water Retention Systems

  • Special Applications

  • Supervision Services

  • TECHNOLOGY AND QUALITY

  • Continuous Filament Winding

  • Centrifugal Casting

  • Standarts & Tests

  • Classification of Products

  • Performance Standarts & Accreditations

  • Quality Control & Performance Tests

  • APPLICATIONS

  • Potable Water and Clean Water

  • Irrigation

  • Hydroelectric Power Plants

  • Waste Water and Drainage

  • Sea Water Intake and Discharge

  • Trenchless Technologies

  • Water Storage Systems

  • Industrial Applications

  • Gallery Systems

  • SUPERLIT IN THE WORLD

  • References

  • Our Business Partners

  • OFFICES

  • Istanbul Headquarters

  • Romania Headquarters

  • FACTORIES

  • Duzce Factory

  • Malatya Factory

  • Romania Factory
Karamancı Holding

Karamancı Holding Company


Back to Top

© 2017 SUPERLIT Boru San. A.Ş. All rights reserved.
  • Linkedin
  • Youtube
  • Rss
Scroll to top