DSİ Aydın Koçarlı Bağarası Sulaması 2. Kısım İnşaatı SUPERLIT CTP Çözümleri ile Devam Ediyor

Jan 17, 2024

The factory acceptance of 4.3 km of GRP (Glass Fibre Reinforced Polyester) pipes and fittings in DN3000-DN2200-DN2000 diameters within the scope of the tender for the purchase of goods for the 2nd Section of Koçarlı Bağarası Irrigation carried out by the DSİ 21st Regional Directorate was carried out in our Düzce Kaynaşlı facility on 08-09.01.2024.

With the products supplied in the previous sections, it is aimed to irrigate 146,040 decares of agricultural land with a modern piped system. As Superlit, we contribute to the effective use and sustainability of water by minimising water loss with our efficient piping solutions.

© 2024 SUPERLIT Pipe Industries Inc.