Installation of Pipes Produced for Liesing Hydroelectric Power Plant Project Started

Aug 31, 2018

The installation of DN1000 mm diameter, PN 4 bar pressure and SN 5000 stiffness class GRP pipes manufactured at our Buzau plant in Romania for the Liesing Hydroelectric Power Plant Project in Austria has started.

© 2024 SUPERLIT Pipe Industries Inc.