Pipes for the Hydroelectric Power Plant Project in Liesing, Austria Arrived at the Construction Site

Jul 18, 2018

DN1000 mm diameter, PN 4 bar pressure, SN 5000 stiffness class GRP pipes produced in our Buzau factory in Romania for the Liesing Small Hydroelectric Power Plant Project have arrived at the construction site and preparations for installation have started.

© 2024 SUPERLIT Pipe Industries Inc.