SUPERLIT GRP Pipes in Kacuni Hydroelectric Power Plant Project in Bosnia and Herzegovina

Aug 28, 2018

As SUPERLIT, we started the shipment of DN1200 mm and DN1100 mm diameter pipes produced in our Düzce factory. While a total of 1600 metres of glass fibre reinforced pipes were produced for this project, we have once again shown that we are a preferred manufacturer in the Balkans.

© 2024 SUPERLIT Pipe Industries Inc.