Superlit Signature in Tekirdağ Hanoğlu Pond Irrigation

Aug 17, 2023

Within the scope of the project, it is aimed to provide 721 ha (gross) of agricultural land with water by taking water from Hanoğlu Pond located in Muratlı district. In this context, in the project carried out by Ali Demirok Construction with the first contract, the manufacturing of 6 km of GRP pipes and fittings in DN800 - DN900 diameters continues. The assembly of the products whose field shipment has been completed has started.

© 2024 SUPERLIT Pipe Industries Inc.